The long-awaited rail link to Kashmir is now poised to begin operations following the green light from officials recently. The Commissioner of Railway Safety (CRS) has given the go-ahead for the final stretch of the Udhampur-Srinagar-Baramulla rail link, approving the 17-km Katra-Reasi section after a thorough inspection. This crucial safety check, conducted by the railway safety audit body under the Ministry of Civil Aviation, marks the last hurdle before trains can begin operating on this challenging route.
